Shopping security

super laykold is recommended in various areas:
All surfaces to be clean, dry, sound, free from all laitance, fungal growth, grease, oil or loose and flaking particles.
This could be achieved by wire brushing or high pressure washing having a rotating nozzle and operating pressure of approximately 170 bar, finally rinsing with clean water.
New galvanised iron:
The surface has to be thoroughly cleaned using sugar soap or any other grease-cutting detergent to remove oils followed by thorough rinsing or high-pressure washing using clean water to reveal a clean, sound, water break free surface.
Old galvanised iron:
Remove all loose rust, dirt, salts of zinc corrosion and scale by means of wire brushing, sanding, chipping, or mechanical scouring – down to bright metal followed by thorough rinsing or high-pressure washing using clean water to reveal a clean, sound, water break free surface.
All surfaces (except metal):
Mix one part super laykold with one part clean water and prime the total area to be covered. As a guide 0.25 L of diluted primer will cover 1 m2. Allow to dry.
Metal surfaces only:
New galvanised iron – prime with bitu.prime or 4 metal primer and allow to dry.
Old galvanised iron – prime with 4 metal primer and allow to dry.
2.1 L/m2 – full system.
First coat (all surfaces after priming):
Brush or roll on a thick coat (0.75 L/m2) and embed the abe® membrane well into the wet coating. On flat surfaces, it is recommended to use a fluted aluminium roller for this purpose. Membrane overlaps should be a minimum of 100 mm on end laps and 75 mm on side laps.
Second coat:
When the first coat has dried sufficiently to take working traffic (2 – 3 hours), apply a second coat of super laykold (0.75 L/m2) to ensure the membrane is completely saturated, and allow to dry.
Third coat:
Apply a final coat of super laykold (0.6 L/m2) to give a smooth finish.
Note: If super laykold is used in a koi pond or dam, allow to dry for 14 days. Flush with clean water before filling.
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with abe® super brush cleaner followed by washing with soap and water.
Do not apply if temperature is below 5 °C.
1 L, 5 L, 20 L and 200 L containers.
This product has a shelf life of 12 months if kept in a dry cool place in the original packaging. In more extreme conditions this period might be shortened.
This data sheet is issued as a guide to the use of the product(s) concerned. Whilst a.b.e.® Construction Chemicals endeavours to ensure that any advice, recommendation, specification or information is accurate and correct, the company cannot – because a.b.e.® has no direct or continuous control over where and how a.b.e.® products are applied – accept any liability either directly or indirectly arising from the use of a.b.e.® products, whether or not in accordance with any advice, specification, recommendation, or information given by the company.
Ships within 48 hours · Estimated delivery Jul 5 - Jul 10
US$40
Get nowSign up to your membership to get coupons up to
15%
Get nowOpportunity to enjoy order discount up to 15% off
Top-Converting Item to Boost Your Average Order